Job Description
COMPANY PROFILE
Incorporated in Texas in 1966, Bo-Mac originally focused on providing civil, pipeline and other construction services for the petroleum exploration industry. In 1974, pile driving capability was added and our primary market expanded to include construction related to the oil and gas refining industry and the petrochemical processing industry. Asphalt manufacturing and paving capabilities were added in 1985 with service primarily to the Texas Department of Transportation. Expansion continued in 1989 with the addition of marine piling and dock construction capabilities.
Scheduler (Construction)
Are you looking for an opportunity to move your career forward with an established industry leader? Join our team at Bo-Mac Contractors! Bo-Mac Contractors is based in Beaumont, Texas and provides piling, marine and civil construction services primarily to the petrochemical and industrial industries.
Primary Responsibilities
• Prepares summary or detailed schedules for proposed projects to determine overall project duration, general conditions, and equipment needs and are to be incorporated into the proposal. The Scheduler
• Works with the project team to establish sequencing, durations and general logic for the construction of the project.
• Visits and walks projects to gather update/actual information. Interface with the Superintendent and project team with regard to schedule actuals and projections.
• Assist in integrating the schedule with the cost controls and quantity reporting system.
• Facilitate weekly schedule meetings and Progress/Cost review meetings with the client representatives.
• Performs special projects and completes all other duties as assigned or requested for the general support of the organization.
Minimum Qualifications
• Bachelor's degree in engineering, business, construction management, related field or related experience.
• Knowledge of Primavera P6 is required.
• Strong knowledge of construction sequencing.
• Presentation skills required in meetings and in training.
• Experience in reading blueprints.
Bo-Mac Contractors, Ltd. is an Equal Opportunity and Affirmative Action Employer.
Qualified candidates will be considered without regard to race, sex, disability, veteran status, sexual orientation or gender identity.
|
|
|
Subscribe to job alerts and upload your resume!
*By registering with our site, you agree to our
Terms and Privacy Policy.